victoriak1208 victoriak1208
  • 31-10-2020
  • Mathematics
contestada

b
It takes 4 workers 6 days to build a shed.
How many sheds could 2
of the workers make in 36
days, if all of the workers
work at the same rate?

Respuesta :

kapoor72 kapoor72
  • 31-10-2020
Two workers can only make 3 sheds in 36 days
Answer Link

Otras preguntas

Roland Enterprises, an American company, has a manufacturing facility in France in order to serve customers throughout Europe. Roland is most likely using a ___
Stephanie was asked to look at a picture of a woman sitting on a deserted beach and to describe what was happening in the picture. She was then asked to tell wh
Which type of line of symmetry does the figure have ? A. vertical B.horizontal C.diagonal D.none
How many stars are there in are solar system
A type of partnership called a ___________ acts much like a corporation and is traded on stock exchanges, but it is taxed like a partnership with profits passin
Find z such that the proportion of observations that are less than z in a standard normal distribution is 0.36 . (Enter your answer rounded to two decimal place
Using __________, network traffic can be filtered based on Active Directory users and groups, both source and destination IP addresses, port number, or specific
can you solve 36 times 97
Suppose that the acceleration of a model rocket is proportional to the difference between 100 ft/sec and the rocket's velocity. If it is initially at rest and i
When governments___________the money supply, businesses have to raise their prices in order to make a profit and stay in business.