aashish26
aashish26 aashish26
  • 29-07-2020
  • Mathematics
contestada

If 300men can do a piece of work in 16days,how many men would do 1/5 of the work in 15days?
​

Respuesta :

roisy
roisy roisy
  • 29-07-2020

Answer:

60men

Step-by-step explanation:

300 men - 15 days - 1 work

men? - 15 days - 1/5 of work

When 1 man does 1/5 of work,

how many days needed = (15 × 1/5) × 300 = 900days

Men needed to complete 1/5 work in 15 days = 900 ÷ 15 = 60men

Answer Link

Otras preguntas

a 14 ounce energy drink contains 10 1/2 teaspoons of sugar. How much sugar is in one ounce of the drink?
Q: Through which of the following ways can heat be transferred? Optional Answer:  A.  By direct or indirect contact between objects at different temperatures.
Mr lip stands for Movement- Region- Location- Human environment interaction- Place- ~What are the definitions to those words?
explain how geographic features can cause local winds?
Q: What happens when cold air approaches a body of warm air?     Optional Answers:      A. The Warm air rises.     B. The warm and cold air both disappear.
What was significant about the new habitats Darwin visited?
What is 4y times y? I really need it for my homework
How do the pacific and Atlantic oceans compare in size and depth?
If y=5x-3 and 3x-y=-1, what is the value of y
what solid figure has 4 faces 6 vertices