ayeeitsjohnny392 ayeeitsjohnny392
  • 30-01-2024
  • Mathematics
contestada

Roma can do a piece of work in 12 days, and Mona in 16 days. If both work together but Roma leaves 4 days before, how many days will it take to complete the work?
a) 6 days
b) 8 days
c) 10 days
d) 12 days

Respuesta :

Otras preguntas

What is the prime factorization of 155
Is0.7866666666 a rational or irrational number
What times what equals 59
When water is heated and changed into a steam, is that a chemical change or a physical change?
How do you write 57 in word form
When you convert 100 feet per second to inches per second will there be more or less than 100 inches?
How do you use compatible numbers to estimate the quotient $595 divided by 25
what kind of jobs do people living in rocinha do
What do butterflies seek in flowers?
an equilateral triangle and a square have the same perimeter. each side of the square measures 6 cm. what is the length of each side of the triangle?